Sharp R-440/540 Manual do Operador Página 79

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 78
918496/GP0313 71
b. Perform the “Mandatory Safety
Shutdown Procedure” on page 10.
c. Remove a spring pin (A, Fig. 30)
from the end of the lift arm lock
bar (B). Remove lift arm lock bar
(B) from the storage bracket.
d. Slide the lock bar (B) all the way
through holes (C, Fig. 30) in the
lift arm and holes (D) in the tilt
pivot arm.
e. Replace the spring pin (A) into the
end of the lock bar (B).
Important: Lock bar (B) must
pass all the way through holes (C)
in the lift arm and holes (D) in the
tilt pivot arm, with spring pins (A)
installed in lock bar (B) on
outsides of the lift arm.
4. On AL 200 and AL 300 Series machines:
a. If necessary, raise the lift arm to allow for down-stop lock bar (A, Fig. 29)
removal.
b. Remove spring pins (A) from both ends of the down-stop lock bar (B).
Remove lift arm lock bar (B) from the machine.
c. Lower the lift arm all the way. Tilt the attachment hitch all the way back.
Note: Holes (C) in the frame, in the lift arm and holes (D) in the tilt pivot
arm must align to allow down-stop lock bar (A) to pass completely
through all the holes.
Figure 27 – 100 Series Lift Arm
Tilt Lock
A
B
D
C
Figure 28 – AL 100 Series Lift
Arm Lock Bar Storage
A
B
Vista de página 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 179 180

Comentários a estes Manuais

Sem comentários