Sharp R-440/540 Manual do Operador Página 72

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 71
64 918496/GP0313
Extend the ROPS
If the machine is equipped with a folding 2-Post
ROPS, only fold the ROPS temporarily if
necessary during transport or if necessary for use inside structures
with low overhead doors or clearances. Operating with the ROPS
folded back increases the risk of injury or death if a roll-over would
occur.
Secure the ROPS into the transport position:
1. Remove the spring pins (both sides) (T, Fig. 18).
2. Remove the clevis pins (both sides) (U, Fig. 18).
3. Fold the ROPS rearward.
Do not allow
the ROPS to
fall rearward, or damage to the
engine cover or injury to nearby
persons may occur. Stay clear
from underneath the ROPS as it is
folded.
4. Insert the clevis pins (both sides) into
transport lock position (V, Fig. 19).
5. Insert the spring pins (both sides) to
secure the clevis pins (both sides).
Restore the ROPS to the
raised position
1. Remove the cotter pins (T, Fig. 18)
(both sides) from the clevis pins (both sides) (U, Fig. 18).
2. Remove the clevis pins (both sides) (U).
3. Fold the ROPS upward and forward.
4. Insert the clevis pins (both sides) (U).
5. Insert the cotter pins (both sides) (T).
WARNING
WARNING
Figure 18 – ROPS Fully Raised
T
U
Figure 19 – ROPS Transport
Position
V
Vista de página 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 179 180

Comentários a estes Manuais

Sem comentários