Sharp R-230B Instruções de Operação Página 19

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 46
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 18
19
5. INSTALLATION
5.1 Selection of qualified personnel
5.2 Installation site
When defining the installation site, observe the necessary space requirements for assembly, mainte-
nance and repair work on the machine (see section 3.2).
5.3 Supply connections
The machine is delivered ready for connection with the relevant connection cables for electrics and
compressed air
.
The compressed air supply must be provided by the customer
. Please observe the
information given in section 3.2.
5.4
Settings
The various components and the electrics are adjusted by Knecht Maschinenbau
GmbH before delivery.
Unauthorised changes to the set values are not permitted and may damage the copy-grinding
machine.
We recommend that the assembly work on the copy-grinding machine be
carried out by trained Knecht personnel. We do not accept liability damage
as a result of incorrect assembly.
CAUTION
Ensure correct connection of the power supply. The connection is provided
on the grinding machine USK 230.
CAUTION
IMPOR-
TANT
NOTE
Vista de página 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 45 46

Comentários a estes Manuais

Sem comentários