OPTION 2: Filled Wood Frame
O2.5: Once all boards are level and do not wobble,
pack “Pea” gravel or dirt around the outside of the
frame, and slope away from frame.
O2.7: Now ll the inside of the frame with “Pea” gravel.
Use a leveling board to scrape off extra ll material and
to level the surface.
118 1/4”
93 1/2”
Item Qty.
2” x 6” x 86 1/2” treated board* 2
2” x 4” x 118 1/4” treated board* 2
8d 1 1/2” common nails 16
1” ‘L’ bracket 4
“Pea” gravel 9.8 cu. ft. (approx.)
Leveling board (2” x 4” x 10’) 1
* Must be rated for outdoor use.
O2.2: Nail an L-bracket on each corner
of the frame with 8d nails.
O2.1: Be sure you use lumber that is treated and approved for outdoor
use. Cut outside frame to 93 1/2” x 118 1/4” outside dimensions:
O2.3: Square up the frame by measuring
from corner to corner. Measurement A
should equal Measurement B.
A
B
O2.6: Use
approximately
9.8 cu. ft. of
“pea” gravel.
Note: Ensure frame is at with widest
ends facing up. Ensure frame is level.
O2.4: Place platform in the desired location. If platform does not rest level on the ground, build up low points with loose
dirt or “Pea” gravel, until platform is stable.
33
14.15: Install Next Roof Panel.
SS (11)
14.16: Install last Roof Panel.
SS (11)
Hardware Bags:
1001632
Screwdriver
Hardware Bags:
1001632
Screwdriver