Sharp AH-X10BE Manual do Utilizador Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
12
6.1: Insert two Wall Panels (108) along back side of shed. Fasten
panels with Screws (SS). Make sure holes line up.
6
Back Wall Assembly
Do Not Over-
Tighten Screws Second person should apply
pressure on opposite side of
the wall for easy insertion of
screws.
6.2: Fold Right Back Corner Panel (106). Snap into
place and fasten with Screws (SS).
Hardware Bags:
1001632
Screwdriver
SS (15)
Place Wood Block (BC) directly under
the tab you are inserting. Snap tabs
into place one at a time.
Pl
th
in
p
r
th
sc
re
ws
1.
2.
106
29
14.5: Follow steps 13.2-13.4 and install a Roof Panel and Roof Support
on opposite side.
14.6: Position the Front Roof Cap (115) as shown. Secure to Front
Gable with Screws (SS).
Screwdriver
SS (11)
Hardware Bags:
1001632
SS (4)
AI (1)
Screwdriver
Hardware Bags:
1001632
(Not Actual Size)
Note: The holes in the Roof Support Strips are for
manufacturing purposes only.
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Comentários a estes Manuais

Sem comentários