Site Selection
1.2: Wherever possible you should use the surfaces described above. When this is not possible, we recommend you
use one of the following options:
Alternate Site Preparation
OPTION 1: Wood Platform
O1.1: Be sure you use lumber that is treated and approved for outdoor
use. Build outside frame to 93 1/2” x 118” outside dimensions:
Item Qty.
2” x 4” x 90 1/2” treated board* 8
2” x 4” x 118 1/4” treated board* 2
48” x 93 1/2”’ Plywood (ACX)** 2
22” x 93 1/2” Plywood (ACX)** 1
16d 3” common nails 32
8d 1 1/2” common nails 36
* All lumber must be rated for outdoor use
** Trim 4’ x 8’ sheets to this size
Note: Any platform or similar structure should be built above ground in order to avoid water pooling inside shed.
R
E
M
A
R
Q
U
E
Surface must be leveled before installation. If the surface
is not properly leveled, the Outdoor shed will not assemble
or function correctly. Proper surface leveling will save you
time in the long run, so please do not ignore this step.
Remove the Parts List from the center of this manual, and locate color “Construction Tips”
insert in box.
Before Beginning!
10’
10’
8’
8’
118”
93 1/2”
1.1: The actual dimensions of your shed (at its widest and longest points) are 8’ x 10’. Be sure to select a
site that will accommodate these measurements. The base of the shed is slightly smaller than this, so you
will need to create a level surface that is at least 93 1/2” x 118”. We recommend using a level cement or
patio style surface. This will provide the best long-term performance for your shed.
35
15
Skylight Installation
15.1: Pre-fold Skylight (AJ)
before installing.
15.2: Push folded skylight up through opening; open skylight;
use tabs to pull skylight down into place.
15.3: Fasten skylight in place with screws (pull on tabs while inserting
screw to provide resistance).
LA (24)
LB (24)
Only use a hand screwdriver on this step
Hardware Bags:
HH11600
Repeat for all skylights.
Screwdriver
LB
LA
16
Align Doors
Fig. 1
Fig. 2
High Side
High side
Low side
Shim should be placed at the corner,
running directly under one wall.
First Shim
Second Shim
16.1: In some cases, the shed doors may not completely line up at the tops ( g. 1). When this happens, identify which
side is higher and use a shim (BD) to slightly raise the back corner of the high side until doors line up ( g. 2). If doors
need further adjustment, insert another shim under the front corner opposite of the rst shim. If the doors still need
further adjustment, stack additional shims (one at a time) alternating between the back and front shims.
16.2: After doors are aligned, cut off any portion of wood shim that is still exposed. From inside the shed, drive a 1”
nail through the oor into the shim to hold it in place.