5. Begin connecting the fan by rst attaching the bottom two snaps on the fabric.
The bottom snaps are located about 2 feet apart, while all of the other snaps are
about 9 inches from each other. After you’ve attached the bottom snaps, begin
connecting the side snaps going up one snap at a time on each side. Finally,
attach the single snap on the top of the fan.
6. After the fan has been secured to the dome, turn it on high. As the dome begins
to inate, walk around it lifting it slightly until it starts to take a circular shape.
Make sure that the two tunnels are not twisted or folded and that the edge of the
fabric inside the dome is completely at against the oor. You can speed up the
ination process by holding the entrance tube closed so no air comes out. Once
the dome is completely inated, the entrance tube will close automatically. When
the dome is fully inated, it may begin lifting off the oor slightly.
7. Both the ination and entrance tubes have two right-angled bends in them to
prevent light from leaking into the dome. Walk around the outside of the dome
and make sure both of these tunnels are “squared off”. Also make sure that the
back of the fan is set back at least 18 inches from the dome material.
Note
If the fan is too close, the fabric of the dome can block the airflow causing
the fan to overheat and the dome to collapse. It is a good idea to place the
empty fan box in between the inflation tunnel and the inflated dome to serve
as a buffer in case the dome drifts while the program is taking place.
Make sure that the entrance and inflation
tubes are “squared off” to prevent light from
entering the STARLAB dome.