Sharp YO-370 Manual Página 31

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 30
FTS 370d/w/r Revision 10 – 1/09/2015 19
Communication Cable Kit
A CAT 5 cable provides the RS 485
communications link between the SC 370
designated as System 1 and all subordinate
units installed in the system. Two
connections at J4 on PCB1 allow multiple
units to be daisy chained together. Either
port may be utilized as an input to or
output from PCB 1.
The required number of Communication
Cable Kits (P/N 4362039) is supplied with
each complete SC 370 system. Each kit
consists of a cable and two strain relief
connectors with inserts for the cable. One
strain relief is to be installed in System 1
and the other in System 2. Follow the
method below for routing the cable if
flexible conduit is not utilized for the
installation.
1. Install the ¾” cable strain relief on the
enclosure.
2. Slide the dome nut over the cable.
3. Install the connector insert over the
cable with tapered end facing away
from the connector.
4. Push the connector through the
housing from outside the enclosure.
5. Push the cable insert into the strain
relief housing.
6. Plug the cable into PCB1 and position
the cable, providing a small amount of
slack inside the cabinet to reduce stress
on the connector. Coil excess cable
equally between enclosures. Do not
cut and splice to remove excess cable.
7. Tighten the strain relief connector
dome nut.
8. Repeat steps 1-7 to connect additional
SC 370 units (3-6).
WiFi Option Antenna Installation
All internal components of the optional
WiFi access point are factory installed.
The antenna must be installed after the SC
370 is mounted. The following
instructions are provided to mount the
antenna to the SC 370 enclosure using the
supplied hardware kit. Figure 2-3
provides a pictorial of the installation.
Connection to the WiFi access point is
discussed in Section 4.
1. Locate the following items supplied
with the SC 370 system:
WiFi Antenna (P/N 5905231)
Shielded CAT 5 Cable 6’ (P/N
4362028)
Antenna Mounting Kit (P/N 1370191)
o Conduit Hub with lock ring
o Conduit Nipple 0.75” x 12”
o Coupling
o Cable Strain Relief
o Custom Insert (Cable Strain
Relief)
o (2) Adjustable Clamp 1 1/16” – 2”
2. Attach the conduit hub to one end of
the 12” nipple and the coupling to the
other end.
3. Screw the strain relief into the
coupling.
4. Locate and remove the access cover
from the back of the WiFi antenna.
Remove the knockout that is located
below the ground terminal.
5. Center the WiFi antenna on the
conduit assembly and attach using the
two adjustable clamps. The top of the
WiFi antenna must be located nearest
the conduit hub.
6. Locate an available 0.88” hole on the
SC 370C unit and install the antenna
assembly. See Figure 2-8 for the SC
370 hole configuration.
7. Connect the CAT 5 cable to the RJ 45
connector located on the WiFi antenna.
Route the other end of the CAT 5
cable through the strain relief and into
the SC 370. Leave a small drip loop
between the antenna and the conduit
assembly.
8. Route the CAT 5 cable to the Power
Over Ethernet (POE) Injector and
connect to the terminal labeled “POE”.
9. Install a ground wire (8 AWG
recommended) from the antenna
ground terminal to the site ground.
10. Replace the access cover.
Vista de página 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 117 118

Comentários a estes Manuais

Sem comentários