Sharp R-8730-A Especificações Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 14
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
SERVICING INSTRUCTIONS
ADJUST GRINDER BURRS
After replacing grinder burrs, or to compensate for wear from
extended use, it may be necessary to adjust the burrs.
Empty the hopper and run the grinder until there are no more
beans in the burrs. Remove the front access panel.
Note the position of the grind adjustment. Turn the adjustment
head fully clockwise (fine grind) until it is against the stop.
Using a 9/16” box-end wrench to loosen the jam nut. Use a large
flat-head screw driver to turn the adjustment screw one full turn
counter-clockwise.
Press the start switch. Slowly turn the adjustment screw
clockwise until the burr teeth just begin to click. Then, turn the
adjustment screw counterclockwise 1/8 turn, or until the clicking
stops.
Tighten the jam nut while holding the adjustment screw from
turning. The grinder is now set to the finest grind.
Return the adjustment head to its original position. Refill the
hopper and run several tests to be sure the grind is satisfactory.
Adjust as necessary.
REPLACE SHEAR DISK
Unplug the grinder from electric power. Empty the hopper.
Remove the front access panel.
Using a 1/2” socket, remove two hex bolts holding grinder
adjustment head to grinder body.
Remove shear disk cover and broken pieces of shear disk.
Withdraw the feedworm and burr assembly. Clean the inside of
the grinder head and grinder adjustment head. Be sure that no
debris or foreign objects remain in the surface of the burr plates.
Slide the feedworm back onto the motor shaft. Turn the shear
drive so that it engages the motor shaft.
Align the slot in the feedworm with the slot in the shear drive.
Insert a new shear disk and replace the shear cover.
Reinstall grinder adjustment head. If replacing the wooden plug,
be sure to install it so that the flat end is toward the shear cover.
Be sure it is properly aligned and the bolts are securely tightened.
Reconnect to electric power. Refill the hopper and run several
tests to be sure the grind is satisfactory. Adjust as necessary.
8
Fig. 5 Adjust Burrs
Fig. 6 Replace Shear Disk
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14

Comentários a estes Manuais

Sem comentários