This document has been published to be used forafter sales service only.The contents are subject to change without notice.Parts marked with “ “ are im
AR-D15/D20 ELECTRICAL SECTION 5-1[5] ELECTRICAL SECTION1. Actual Wiring ChartA. AR-D1511MCPEDTXD-DSKDDRSP-GND10N.C.543DSR-DSK/S-GNDRXD-DSK/1DTR-DSK/2n
AR-D15/D20 ELECTRICAL SECTION 5-211MCPEDTXD-DSKDDRSP-GND10N.C.543DSR-DSK/S-GNDRXD-DSK/1DTR-DSK/2nd Control PWBRES-DSK8TRC-DSK/DPFD179MCLUD2CN-F6MCPWS2
AR-D15/D20 ELECTRICAL SECTION 5-3B. AR-D20TXD-DSKRXD-DSK/DTR-DSK/RES-DSKP-GNDGND2DSR-DSK/TRC-DSK/S-GND123456789234VD(+5V)TSPD1TLUM2P-GNDVD(+5V)S-GNDVB
AR-D15/D20 ELECTRICAL SECTION 5-4TPCL2TXD-DSKRXD-DSK/DTR-DSK/RES-DSKP-GNDGND2DSR-DSK/TRC-DSK/S-GND123VD(+5V)VD(+5V)TPFD3TSPD2TPCL1123456789234VD(+5V)T
AR-D15/D20 ELECTRICAL SECTION 5-52. Circuit DiagramA. Desk Control PWBAABBCCEDCBACNF-6TXD-DSKC103473Z/50VCNF-8DTR-DSK/CNF-10RES-DSKC14347uF/35V+C14247
AR-D15/D20 ELECTRICAL SECTION 5-6CCDDEEEDCBACNC-2,H-2TPCL2/(DPCL2/)CNG-2TPCL1/ (DPCL1/)(DCSS21)CNL-5(DCSS25)CNL-1TPFD1(MPFD)/ (DPFD1)CNE-12TPED2 (DPED
AR-D15/D20 ELECTRICAL SECTION 5-7AABBCCEDCBATSPD2 DETEC TERTLUD2741S-GND9CN-A63S-GND852N.CTPED2(B9B-PH-K-S)VD(+5V)471TLUM2S-GNDS-GND6P-GND10253811S-G
AR-D15/D20 ELECTRICAL SECTION 5-8CCDDEEEDCBACN-ACN-BCN-D CN-FCN-CCN-HCN-ICN-MCN-JPICK UPCLUTCHGND1(P-GND)4716(B20B-PHDSS-B)1025389CN-DCN-M(B11B-PH-K-S
AR-D15/D20 ELECTRICAL SECTION 5-9B. Power Supply PWB (100V series)
AR-D15/D20 ELECTRICAL SECTION 5-10C. Power Supply PWB (200V series)
AR-D15/D20 SPECIFICATIONS 2-1[2] SPECIFICATIONS1. AR-D15AR-D14 AR-D15 RemarkType Stand /3x500 Sheet Paper Drawer (2 paper trays + 1 multi purpose draw
– 1 – PARTS GUIDE[ 注 ]本パーツガイドは、AR-MU1/AR-D13/AR-D14/AR-DC1 からの変更点のみを記載しています。AR-MU1/AR-D13/AR-D14/AR-DC1( 資料コード:00ZARMU1//P1/) を合わせて活用下さい。[Note]The AR
– 2 –2外装部 (Exteriors)3左ドア (Left door)3左ドア (Left door)NO. PARTS CODEPRICE RANKNEWMARKPARTRANKDESCRIPTIONEx. Ja.2 MSPRC2915FCZ2 AC DJ CLeft door follo
– 3 –5フレーム 1(Frame 1)[AR-D15]5フレーム 1(Frame 1)[AR-D15]6フレーム 2(Frame 2)[AR-D15]6フレーム 2(Frame 2)[AR-D15]NO. PARTS CODEPRICE RANKNEWMARKPARTRANKDESCRIPTIO
– 4 –7フレーム 1(Frame 1)[AR-D20](Except Japan)7フレーム 1(Frame 1)[AR-D20](Except Japan)8フレーム 2(Frame 2)[AR-D20](Except Japan)8フレーム 2(Frame 2)[AR-D20](Except
– 5 –9タンデムカセット (Tandem cassette)[AR-D20](Except Japan)9タンデムカセット (Tandem cassette)[AR-D20](Except Japan)Fタンデム搬送 (Tandem transfer)[AR-D20](Except Jap
– 6 –Gマルチ給紙 (Multi paper feed)Gマルチ給紙 (Multi paper feed)H多段給紙 (Paper feeding section)[AR-D15]H多段給紙 (Paper feeding section)[AR-D15]NO. PARTS CODEPRICE R
– 7 –Jマルチ駆動 (Multi drive)Jマルチ駆動 (Multi drive)K多段駆動 (Drive section)[AR-D15]K多段駆動 (Drive section)[AR-D15]NO. PARTS CODEPRICE RANKNEWMARKPARTRANKDESCRIPT
– 8 –Lタンデム駆動 (Tandem drive section)[AR-D20](Except Japan)Lタンデム駆動 (Tandem drive section)[AR-D20](Except Japan)O梱包 & 付属品 (Packing Material & A
– 9 –P梱包 & 付属品 (Packing Material & Accessories)[AR-D20](Except Japan)P梱包 & 付属品 (Packing Material & Accessories)[AR-D20](Except Japan)N
– 10 –T3T コントロール基板 (3T Control PWB)[AR-D15]UTAN コントロール基板 (TAN Control PWB)[AR-D20](Except Japan)NO. PARTS CODEPRICE RANKNEWMARKPARTRANKDESCRIPTIONEx.
AR-D15/D20 SPECIFICATIONS 2-22. AR-D20AR-D13 AR-D20 RemarksType Stand MPD&2000 Sheet Paper Drawer (large capacity tray + multi purpose drawer)Tran
– 11 – 索引 (Index)PARTS CODEJAPAN ONLYORDER CODENO.PRICE R.NEW P/REx. Ja.[C]CFRM-1041FC33572 213 2174 6- 34 BF HZ D"572 213 2174 8- 61 BF HZ DCFRM
Contains lithium-ion battery. Must be disposed of properly.Remove the battery from the product and contactfederal or state environmentalagencies for i
COPYRIGHT 2002 BY SHARP CORPORATIONAll rights reserved.Printed in Japan.No part of this publication may be reproduced,stored in a retrieval syst
AR-D15/D20 EXTERNAL VIEWS AND INTERNAL STRUCTURES 3-1[3] EXTERNAL VIEWS AND INTERNAL STRUCTURES 1. AR-D15Code Name Function Active condition Remark1 D
AR-D15/D20 EXTERNAL VIEWS AND INTERNAL STRUCTURES 3-22. AR-D20Code Name Function Active condition Remark1 TPFD2 Tandem tray paper transport sensor 2 T
AR-D15/D20 UNPACKING AND INSTALLATION 4-1[4] UNPACKING AND INSTALLATION1. AR-D15<Before installation>•Start installation after checking that the
AR-D15/D20 UNPACKING AND INSTALLATION 4-2<2>Pull out the upper paper tray of the stand/paper drawer until it stops and attach the front mounting
AR-D15/D20 UNPACKING AND INSTALLATION 4-32. AR-D20<Before installation>•Start installation after checking that the DATA and COMMUNICATIONindicat
AR-D15/D20 UNPACKING AND INSTALLATION 4-4<2>Pull out the upper paper tray of the stand/paper drawer until it stops and attach the front mounting
Comentários a estes Manuais