Sharp R-64STM Especificações Página 5

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 76
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 4
Planning and Engineering Guide, Release TR5.0.x/TN6.0.x 3
Chapter 1
Traverse Equipment Specifications
Introduction
This chapter includes the following topics:
• Traverse Dimensions Summary Table
• Traverse Rack Configuration
• Power Consumption
• Power Cabling
• Fiber Connectors and Cabling
• Electrical Coax and Copper Connectors and Cabling
• Shelf and Rack Density
• Regulatory Compliance
For guidelines on card placement in specific Traverse shelves and information on GCM
redundancy, see the Operations and Maintenance Guide, Chapter 21—“Card Placement
Planning and Guidelines.”
Vista de página 4
1 2 3 4 5 6 7 8 9 10 ... 75 76

Comentários a estes Manuais

Sem comentários