Sharp R-408H Manual de Serviço

Consulte online ou descarregue Manual de Serviço para Micro-ondas Sharp R-408H. Sharp R-408H Technical data Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 110
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Draft
Operation and Maintenance Manual
for Land Treatment of Petroleum Contaminated Soils
for
MCB Camp Lejeune, North Carolina
Prepared for:
DEPARTMENT OF THE NAVY
Contract No. N62470-93-D-3032
Delivery Order 0015
/,+-
-
Prepared by
OHM Remediation Services Corp.
Norcross, Georgia
John I?. Franz, P.E.
l?rogramManager
James A. Dunn, P.E.
Project Manager
November 1996
OHM Project No. 16032
Vista de página 0
1 2 3 4 5 6 ... 109 110

Resumo do Conteúdo

Página 1

Draft Operation and Maintenance Manual for Land Treatment of Petroleum Contaminated Soils for MCB Camp Lejeune, North Carolina Prepared

Página 2 - TABLE OF CONTENTS

Table 2.1 lists %he major equipment components pertaining to the Biocell. Component 20-mil HDPE liner Table 2.1 Manufacturer In-Line Plast

Página 3

ID’7789725884 P.84 69-28-96 s9:24 MCGINNIS FARMS LAWRENCEVILLE I’ . ’ \ ~’ . . .., I” . ,.‘i ,’ . . . ‘. : .’ * E C-., H. S ‘. l . .

Página 4

/ id I’ 89-28-96 649:25 I MCGINNIS FARMS LAWRENCEVILLE ID=7789725884 T E C H l S P E _. .-- -.. _ P.85 c s .- Falcon” Rotor features &sy

Página 6 - OHM/%6032

In-Line Plastics, Inc. was established by industry leaders /& provide a full range of polyeth- lne liner systems. In-Line Plastics,

Página 8 - OHM/16032

IN- /c”-, ,’ INE PLASTICS, INC. - 12247 FM 529 l Houston, Texas 77041 24-Hr. Hotline: l-800-364-7688 l 713-849-5099 Toll-Free Fax: l-800-449-

Página 9

..- IN- PLASTICS, INC. HERCULINE SPECIFICATIONS Premium Grade Lining Material Herculine linear low density polyethylene is produced from hi

Página 10 - Table 2.1

OF--- IN- PLASTICS, INC. Premium Grade Lining Material HERCULINE SPECIFICATIONS Herculine high density polyethylene is produced from pipe g

Página 11

COUNT WEIGHT TENSILE STRENGTH (Grab Method) TEAR STRENGTH (Tongue Method) MULLEN BURST HERCUSHIELD 30Q DATA SHEET Nominal 10 X 5 tapes/inch 4

Página 12 - 2-3 QHM/16032

Appendix B As-Built Drawings

Página 13 - Technical Data Sheets

Table 2.2 shows the Operation and Maintenance Log completed daily. Technical data sheets or manuals for the items listed above are

Página 14 - Model 3196 XL T-X

E I F I G I H I I I J I K I L I U I N I 0 I P I I I -NE E IUNDARY OF LOT 203 .I GENERAL SITE NOTES: 1. GRAVEL ACCESS RAMPS FOR BIOCELL FROM PINE

Página 15 - THIS MANUAL EXPLAINS

Lot 203 Biocell Date Table 2.2 - Operation and Maintenance Log MCB Camp Lejeune Operator Soil Loaded (YD) Soil Removed (YD) Manifest No. Nu

Página 16 - __-_- --.. -----. .^ .

Appendix A Technical Data Sheets

Página 17 - GENERAL PRECAUTIONS

installation, Operation and Maintenance Instructions, A. Model 3196 *. .- _: ‘., . .-. . . :: ...:Y. . Model 3196 XL T-X @ 1993 Goulds Pumps,

Página 18 - PUMP DESCRIPTION

This manual provides instructions for the Installation, Operation, and Maintenance of the Goulds Model 3196 ANSI Standard Dimension P

Página 19 - E!!**I !%TA%- 1-1

Page SECTION . . .-- ,. ._.* . -__c^J_- __-_- --.. -----. .^ . .

Página 20 - RECEIVING THE PUMP

DEFINITIONS . . l . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 GENERAL PRECAUTIONS . . . . .

Página 21 - SITE/FOUNDATION

PUMP DESCRIPTION ... 9 NAMEPLATE INFORMATlON ... 10 RECEIVING THE PUMP ...

Página 22 - LEVEL’BASEPLATE

I NAMEPLATE INFORMATION E!!**I !%TA%- 1-1 k CAUTION: AFTER STARTING w t4o~ OPERATE AGAINST aosm VALVE 5 Fig. 1 Every pump has two Goulds namep

Página 23 - Vertical Alignment

TABLE OF CONTENTS 1.0 SYSTEM OPERATIONS ... l-l 1.1 Incoming Material Acceptance Testing ...

Página 24 - PARALLELAUGNMENT

RECEIVING THE PUMP I (i Inspect the pump as soon as it is received. Carefully check that everything is in good order. Make notes of damage

Página 25 - Alignment Trouble Shooting

SITE/FOUNDATION ... .I3 LEVEL BASEPLATE ... .I4 ALIGNMENT AND ALIGNMENT PROCEDURE ...

Página 26 - GROUT BASEPLATE

I LEVEL’BASEPLATE I_ 1. Place 2 sets of wedges or shims on the foundation, one set on each side of every foundation bolt. The wedges sho

Página 27 - FINAL PIPING CHECK

, Id li.. Final Alignment (Hot Alignment) :f@- l After First Run - To obtain correct alignment when both pump and driver are at opera

Página 28 - PREPARATION FOR START-UP

ANGULAR ALIGNMENT A unit is in angular alignment when indicator A (Angular indicator) does not vary by more that ,002 in. (.05 mm) as

Página 29 - SHAFT SEALING

NOTE: Equa/ amounts of shims must be added .F--- to or removed from each driver foot. Otherwise the vertic?l angular alignment will

Página 30 - LANTERN RINGS

GROUT BASEPLATE Allow grout to set. 1. Clean areas of baseplate that will contact grout. Do not use oil-based cleaners because grout

Página 31 - PRIMING PUMP

SUCTION PIPING L NPSHA must always exceed NPSUR as shown on Goulds performance cunres received with order. (Reference Hydraulic Institute

Página 32 - STARTING PUMP

PREPARATION FOR START-UP ... .21 Checking Rotation ... .21 Check Impeller Clearance ...

Página 33 - OPERATION

COUPLE PUMP AND DRIVER Lock out driver power to prevent accidental rotation and physical injury. 1. Install and lubricate coupling per m

Página 34 - MAINTENANCE SCHEDULE

i.0 SYSTEM OPERATIONS The Biocell located at Lot 203 is designed to treat only petroleum contaminated soil ;as defined in N.C.G.S. 1

Página 35 - Table 5

c. f-- Other methods may be used which make use of multiple gland connections and/or stuffing box connections. Refer to documentation

Página 36

NOTE: Most packing requires lubrication. Failure to lubricate packing may shorten the life of the packing and pump. Dynamic Seal Opti

Página 37 - MAINTENANCE OF SHAFT SEALS

Pf?IMI?+3 WITH FWT VALVE AM CUTSIDE SLFPLY DISCHARGE ISCLATION VALVE Fig. 16 RZIHIM WITH FOOT VALVE VIA BY-PASSING AROCM Ma( VALVE zJuf

Página 38 - IMPELLER CLEARANCE SETTING

. . . OPERATION GENERAL CONSIDERATIONS Always vary capacity with regulating valve in the discharge line. NEVER throttle flow from the suc

Página 39 - FEELER GAUGE METHOD

I ~.M. L!! .._. -. GENERAL COMMENTS ... .27 MAINTENANCE SCHEDULE. ... .27 MAINTENANCE OF BEARIN

Página 40 - TROUBLE SHOOTING

/ id. w: 3 Month Inspections ,f@-- l Check shaft alignment and realign if required. l Check foundation and hold-down bolts for tightness.

Página 41 - DISASSEMBLY

Mobil DTE 26 300 SSU NOTE: The bearing femperafure usuaiiy rises affer regressing due to an excess suppiy of g?ase. Temperafwee wiii

Página 42 - ..,_ ._ -. -.__.. -r_

MAINTENANCE OF SHAFT SEALS I I - MECHANICAL SEALS When mechanical seals are furnished, a manufacturers reference drawing is supplied with th

Página 43 - Removal of Impeller

IMPELLER CLEARANCE SETTING 1 Lo&out driver power to prevent accidental startup and physical injury. A change in pump performance may

Página 44

FEELER GAUGE METHOD 1. Remove coupling guard. Refer to coupling guard instructions in Appendix II. 2. Loosen jam nuts (4236) on jack bol

Página 45 - M’ IV’

The application rate is determined from baseline carbon:nitrogen:phosphorus present in the untreated soil. Total organic carbon concent

Página 46

TROUBLE SHOOTING Table 7 PROBLEM Troubleshoo%ng Pump PROBABLE CAUSE REMEDY I k that pump and suction No liquid delivered. Wrong direction of ro

Página 47 - (497f3 (497G)

REQUIRED TOOLS. ... .35 DISASSEMBLY. ... .35 INSPECTIONS ...

Página 48 - .-----.---1

5. Disconnect Coupling. /r”-. 6. Remove coupling guard pump endplate. 7. if oil lubricated, drain oil from bearing frame by removing b

Página 49

NO775 Blue and s&be shaft for relocating coupling hub during reassembly. I \ 16. Remove coupling hub (Fig. 24). Removal of Impeller

Página 50 - -_.--.- ._._-_ ,_,.._

/ .,* i:,: lg. REMOVAL OF SEAL CHAMBER COVER (Mechanical Seal) 1. Remove gland stud nuts (355). 2. Remove seal chamber stud nuts (370

Página 51 - ALL MODELS

! 196. REMOVAL OF DYNAMIC SEAL... 3. Remove socket head cap screws (266) (Fig. 33). 4. Remove stuffing box cover (184) and gasket (2

Página 52 - INSPECTIONS

=A. DISASSEMBLY OF POWER END - STX, MTX 1. Remove clamp screws (370C). Back off jam nuts (423). Tighten jack screws (3700) evenly,

Página 53 - Bearing Frame

228. DISASSEMBLY OF POWER END - LTX 1. Remove clamp screws (37OC). Back off jam nuts (423). Tighten jack screws (3700) evenly, this wi

Página 54 - Bearings

22~. DISASSEMBLY OF THE POWER END - XLT-X, Xl 7 1. Remove bearing frame to frame foot bolts (37OF) and frame foot (241) (Fig. 45). 2

Página 55 - Labyrinth Seals

nD. DISASSEMBLY OF POWER END - STX, MlX with Duplex Bearings 1, Remove clamp screws (37OC). Back off jam nuts (423). Tighten jack s

Página 56 - Table 8

O&M Manual 1-3 0HM/16032

Página 57 - REASSEMBLY

j ZE. DlSASSEM6k.Y OF POWER END - XLT-X, Xl 7 with Duplex Bearings 1. Remove bearing frame to frame foot bolts (37OF) and frame foot

Página 58 - Table 12

ALL MODELS I 23. DISASSEMBLY OF BEARING FRAME 1. 2. 3. Remove oil fill plug (113A), oil drain plug (408A), sight glass (319), sight oi

Página 59

I INSPECTIONS The Model 3196 parts must be inspected to the following criteria before they are reassembled to insure the pump will ru

Página 60

- - I . Shaft and Sleeve 1. Check bearing fits. If any are outside the tolerance in Table 8, replace the shaft (122) (Fig. 64A). 2. C

Página 61 - FiQ. 79

_* : k I t I ; 1 /L- Dynamic Seal Repeller 1. inspect dynamic seal repeller (262) vanes for damage. Replace if grooved deeper than 1 /16

Página 62 - ~ XLT-X, X17

Bearing Housing 1. Inspect-bearing housing (134) bore according to Table 8. Replace if dimensions exceed Table 8 values. 2. Visually insp

Página 63

Table 8 3196 Bearing Fits & Tolerances according to ABEC I standard Shaft0.D. Inboard STX MTX in. (mm) in. (mm) 1.3785 1.7722 (35.013) (45

Página 64

REASSEMBLY Refer to Table 9 for torque values while reassembling pump. Table 9 Bolt Torque Table LOCATION 6’STX CASING BOLTS (370) 8’STX

Página 65 - Xl7 with Duplex Bearings

Table 12 3196 Shaft Runout Tolerances WtiSleeve LessSleeve Sleeve Fit Coupling Fit in. (mm) in. (mm) .OOl (.026) ,001 (.026) .cO2(.051) .OOl (.

Página 66 - ^ _ . - .

3. Install outboard bearing (112A) on shaft (122) (Fig. 75). d NOTE: Regreaseabie bearing has a single shield. The outboard bearing is

Página 67

1.3 WATER MANAGEMENT Because soil microorganisms inhabit and are only active within thin films of water, the soil water content is ma

Página 68

Id L,. w ( j , f-. 17. Install jacking bolts (370D) with locking nuts (423) into housing (134). Hand tighten. Fig. 77 LTX NOTE: Make sur

Página 69

FiQ. 79 9. Coat outside of outboard bearing (112A) and bearing housing (134A) bore with oil. 10. Install bearing housing (134) onto

Página 70 - . .-._ -_

I: ~ XLT-X, X17 NOTE: Make sure ‘that threads are clean and appiy thread sealant to pipe threads and fittings. 1. Install oil fill plu

Página 71 - _.. .- --.- _

8. install inboard bearing (169A) on shaft (122) (fig. 87). NOTE: Regreaseabie bearing has a single e shield. The inboard bearing is i

Página 72 - Wii Packing:

sm, MTX with Duplex Bearings 1. Install the oil fill plug (113A), oil drain plug (408A), sight window (319),-sight oiler plug (468Jj,

Página 73 - Pumps With Dynamic Seals:

10. Install clamp ring (2536) with bolts (236A). Tighten bolts in a crisscross pattern. Check shaft for free turning. Refer to Table

Página 74

1 Fig. 96 5. Coat outside of outboard bearing (112A) and bore of bearing housing (734) with oil. 6. Install bearing housing (134) on

Página 75 - POST ASSEMBLY CHECKS

12. Co;to;il internal surfaces of bearing frame (228A) 13. Install shaft assembly into frame (228A). Check shaft for free turning (F

Página 76 - ..iI---,T-h

6. lnstall frame adapter (108) onto frame assembly. Align bott holes and dowel locations with those on frame (Fig. 105). 7. Install d

Página 77 - Fasteners/Plugs

2. Check seal chamber cover run-out. Rotate indicator through 360 degrees. If total indicator reading is greater than 0.006 in. (.I3

Página 78

Table 1.3 - Percent Moisture Data Lot 203 Biocell O&M Manual l-5 OHM/16032

Página 79 - \ >57K

P,--. /_ ,,- !‘. 6. Loosen clamp bolts (37OC), and jacking bolts (3700). Measure gap between impeller (101) and seal chamber/stuffing bo

Página 80 - ,f”-=

, 10. Remove Seal chamber cover (184). Fia. 116 11. Install stationary seat into gland (107) per seal manufacturers irxtructions. 12.

Página 81

Pumps Wii Packing: 1. Install stuffing box cover (184) with nuts (370H). Fig. 121 2. Checkstuffqboxcover&t-ouLRotateindii through 360

Página 82 - RECOMMENDED SPARE PARTS

6. Check impeller runout. Check vane tip to vane tip. Total indicator reading greater than 0.005 in. (.13 mm) indicates a problem (Fi

Página 83 - INTERCHANGEABILITY

ALL MODELS STX, MTX, LTX, XLT-X, X17 I 4. Install casing bolts (370), finger tight. Casing bolts (370) may be coated with anti-galling com

Página 84 - HOW TO ORDER

I POST ASSEMBLY CHECKS After completion of these operations check whether it is possible to rotate shaft easily by hand. If all is pro

Página 85

70 ..iI---,T-h ._ ,. --- 1, .I. -,.- _-,.

Página 86 - FRAME LUBRICATION CONVERSION

Fasteners/Plugs , Material Goulds Pumps Material Code Carbon steel 2210 StainlessSteel 2228 316 Stainless Steel 2229 ASTM A307Gr.B. Frn F5!?3GR

Página 87 - Grease Lube

hi CL ,-A&_-, -_- .1 - - ,_..,..._. s, ..,I ^___ ‘.a -^.. a.._ ..^... .._..._ “^-. _ STX 408J \ 40e.M, e, 503 - REOUIREO FOR

Página 88 - Assembly:

,- 4; MTX 113 \ 406H-* ‘36 1A \ \ \o \ >57K 370 4 1.3 4 \ ‘3600 --.. - ._ .- ----. __--._. .- 73 _ _ _ ---

Página 89 - Details:

Initial Characterization Baseline soil samples will be collected from the placed lift prior to initiating treatment for each batch, an

Página 90 - Disassembly

kd f! .*_ .--. -.----_-_Ic . ..--. _ .” _-_ ._ .__..,.- _ _,... _. .-,-_-.,- ,~“Aj,, iij- * ‘.., _,_-,..._^_” -...- .-.-. jj^ _

Página 91

XLT-X I. 113A 19

Página 92 - (GPM @ MAXIMUM DIAMETER)

RECOMMENDED SPARE PARTS ... ,, 77 INTERCHANGEABILITY ... ,78 HOW TO ORDER PARTS 79 APPENDIXl...::

Página 93 - GOULDS PUMPS, INC

INTERCHANGEABILITY 3196 MODULAR/DMENSIONAL INTERCHANGEABILI~ i%!E &3s8%f4ffi ADAPTER STUFFING BOX IMPELLE!? CASING SIZE/ANSI DESIGNATION MOOEL

Página 94 - Tank Eff bent

EMERGENCY SERVICE t Emergency parts service is available 24 hours/day, 365 days/year . . . Call l-800-446-8537 HOW TO ORDER When ordering p

Página 96

Lubrication Conversion Pumpage Temperature Pumpage Temperature below 35o.F (177%) above 35O’F (177%) NLGI Consistency 2 3 Mobil Mobilux EP2

Página 97 - Performance bata

,~Conversion from Flood Oil to Regreaseable 2. NOTE: Make sure that pipe threads are clean and apply thread sealant to plugs and fitting

Página 98 - R-70FC.%PC

fnstailation Instructions for Goulds ANSI 615.1 Coupling Guards Before assembly or disassembly of the coupling guard is performed the moto

Página 99 - PO7.?lBLE

2. Spread bottom of coupling guard half (pump end) (P+-=-~~ slightly and place over pump end plate as shown in Fig. C. The annular

Página 100 - Uncompromising Performance

If the soil analyses indicate continued presence of elevated petroleum hydrocarbons, additional nutrients are applied to the soils an

Página 101 - Falcon” Rotor

5. place end plate (driver end) over motor shaft as shown in Fig. G. Locate the end plate in the annular groove at the rear of th

Página 103 - EXTRUSION SEAM

c MODEL 3196 RECOMMENDED MINIMUM FLOW (GPM @ MAXIMUM DIAMETER) 8 Pole EdI Hz 885RPM 1x2-1oMTx 40 22 5 3 3 lt?x3-1ohm 80 56 14 6 5 2x

Página 104

. . : .I . ,” ‘. I. B , GOULDS PUMPS, INC. lNOUSTRlAL PRODUCTS GROUP Seneca Falls, New York X348 Form No. EPD-166 Rev. l/94 Printed in

Página 105 - INE PLASTICS, INC.

t: i: $, ,. Applications: l .J l i ._ Septic Tank Eff bent High Head Sump Dewatering i1HP 4 208-230 voltage (10) 208-230/660,575 voltage I301 6

Página 106 - PLASTICS, INC

The Hydromatic SHEFSO/ 100 submersible pumps are specifically designed to meet the demands of residential high head septic tank eflluent

Página 107

The SHEFSO/lOO are completely submersible “high head” pumps for use ’ I’ in residential septic tank effluent pumping applications and ar

Página 108 - HERCUSHIELD 30Q

Pump Characteristics hssdaNon ” *... . I ChlsrB Msdlmgr 9x0 2” NPT Std. : _’ Solids Naodlbtg 3/4” unit wefghs SUlbr (SO) 1 65lbs.#lO) Pow

Página 109 - As-Built Drawings

89-28-96 89: 23 MCGINNIS FARMS LAWRENCEVILLE ID’7789725884 Full or Part Circle Rotor POP-UP Sprinklers R-70FC.%PC SPRINKLERS Closed-case rolor for

Página 110 - ATLANTIC DIVISION

89-28-96 t39:24 MCGINNIS FARMS LAWRENCEVILLE R-70RUBBER COLLAR Protects from injury and damage fur high-traffic appkations. Features * Durable, hig

Comentários a estes Manuais

Sem comentários